FPS / Divisions / Construction & Restoration FPS / 2026 / DIV-08 DIV / 08

From mitigation to occupancy, under one PMO.

FPS Construction & Restoration closes the recovery loop — commercial roofing, building envelope, interior renovation, and large-loss reconstruction. Restoration-grade methodology, owner-occupied execution discipline, and audit-aligned documentation across education, healthcare, hospitality, multifamily, and commercial portfolios. Integrates upstream with Disaster Recovery, Environmental, and Electrical Systems.

12
Sectors Served
Multi
Site Capable
IICRC
Restoration Standards
Audit
Aligned PMO

Restoration-grade methodology, multi-sector execution.

Eight service lines covering the full construction and restoration scope — from emergency board-up through final reconstruction and close-out.

01

Commercial Roofing

Commercial roofing across single-ply, modified bitumen, metal, and specialty systems — restoration-grade and new-construction.

  • — Single-ply
  • — Modified bitumen
  • — Metal + specialty
02

Industrial Roofing

Heavy industrial roofing for manufacturing, distribution, and large-footprint commercial facilities — high-bay, complex penetrations, multi-acre coverage.

  • — Industrial scale
  • — High-bay capable
  • — Multi-acre coverage
03

Building Envelope

Full building envelope restoration — exterior cladding, windows, waterproofing, and weather-tight reconstruction.

  • — Full envelope
  • — Cladding + windows
  • — Waterproofing
04

Interior Renovation

Interior renovation across owner-occupied and vacated spaces — finishes, MEP integration, code-compliance upgrades.

  • — Owner-occupied capable
  • — MEP integration
  • — Code upgrades
05

Concrete & Structural

Concrete restoration and structural reinforcement — foundations, slabs, walls, and structural members.

  • — Concrete restoration
  • — Structural reinforcement
  • — Foundation work
06

MEP Integration

Mechanical, electrical, and plumbing integration across restoration and renovation scopes — coordinated with FPS Power & Energy and Electrical Systems divisions.

  • — MEP integrated
  • — Coordinated DIV-02 + 03
  • — Single PMO
07

Reconstruction PMO

Reconstruction project management — managing scope against federal cost requisitions, lender draws, and audit documentation chains.

  • — Audit aligned
  • — Lender requisitions
  • — Adjuster sync
08

Specialty Restoration

Specialty restoration scopes — historic structures, marquee campus restoration, and high-value asset recovery.

  • — Historic capable
  • — Marquee campus
  • — High-value asset
FPS / DIV-08 / Large-Loss Reconstruction

From mitigation to occupancy under one PMO.

Commercial roofing, building envelope, interior renovation, and large-loss reconstruction across education, healthcare, hospitality, multifamily, and commercial portfolios.

Steel Foundry Rebuild

Audit-aligned, multi-sector restoration.

Construction and restoration sit at the end of FPS' integrated response — when mitigation is complete and the rebuild begins. Our methodology is engineered around audit-grade documentation, owner-occupied execution, and the multi-sector realities of education, healthcare, hospitality, and commercial portfolios.

  • C.01
    Federal-Grade Documentation

    $250M+ annual program leadership across leadership careers. Documentation, scope, and reporting cadences engineered around federal stakeholder workflows.

  • C.02
    Owner-Occupied Discipline

    Multi-sector owner-occupied execution — academic-calendar-aligned in education, infection-control-aligned in healthcare, brand-protected in hospitality.

  • C.03
    Reconstruction PMO

    Named project leadership, structured client reporting, and audit-ready documentation from day one through final close-out.

  • C.04
    MEP Integrated

    Mechanical, electrical, and plumbing integration coordinated across FPS' Power & Energy and Electrical Systems divisions — single PMO accountability.

  • C.05
    Multi-Site Portfolio

    Crew, equipment, and management capacity purpose-built for multi-site events — portfolio-scale execution under one engagement, one cost center.

  • C.06
    Marquee Campus Capability

    Reconstruction capability proven at marquee institutional campuses — Disney Archives, Texas Medical Centers, GM Plant, AIG Campus.

Active Engagements

Active in construction, today.
  • Steel Foundry rebuild — 5 months total completion including code-compliance overhaul.
  • Reconstruction scopes across the multi-district DHS IDIQ engagement.
  • Multi-sector restoration capability — education, healthcare, hospitality, multifamily, commercial.
  • Federal-grade documentation discipline applied across active engagements.
  • Marquee institutional campus restoration past performance.

Sectors served.

Education & Universities
Healthcare & Medical
Hospitality & Resorts
Multi-Family & HUD
Commercial Real Estate
Industrial & Manufacturing
Federal Installations
Government & Municipal
Data Centers
Marquee Campuses
Audit-Aligned

Engagements in this division.

A representative selection. Each case demonstrates this division's capability against a live engagement, active program, or documented past performance.

Full Case Library

Engage FPS
before the event.
When the partnership is already in place.

24/7/365 dispatch for emergency response. For program-level engagements, capability briefings, or master service agreements — our leadership is available by direct line and on-site visit.

24/7/365 Emergency Dispatch
Strategic Partnerships
Thomas Sirk
VP, Strategic Partnerships · 904-720-6556
Direct Email
Headquarters
FPS
32603 Tall Oaks Way · Magnolia, TX 77354