The project cannot wait for the hotel market.

FPS Workforce Housing Solutions delivers turnkey crew camps and project campuses for large-scale construction, energy, and infrastructure programs where the local lodging market cannot absorb the headcount. Site design, modular stand-up, food service, utilities, security, and transport run under FPS direction from first occupancy through demobilization. 100 beds to 5,000 beds. CONUS and OCONUS.

100–5K
Bed Capacity Range
Days
To First Occupancy
24/7
Camp Operations
1
PMO, Mob to Demob

Headcount is the constraint nobody models until it's late.

A 2,000-person construction program in a market with 400 hotel rooms is not a logistics problem. It is a schedule problem, a retention problem, and a cost problem that compounds every month the camp is not standing. FPS treats workforce housing as critical infrastructure for the project, not an amenity to be sourced after mobilization.

  • W.01
    Speed to Occupancy

    Modular stand-up sequenced for first beds in days, full capacity in weeks. Phased occupancy tracks the project's own ramp so housing is never the critical path.

  • W.02
    Self-Contained Utilities

    Power, potable water, wastewater, climate, and communications engineered as a closed system where local infrastructure is absent, overloaded, or unreliable. Integrates directly with FPS Power & Energy and Electrical Systems.

  • W.03
    Retention Infrastructure

    Quality of housing, food, and connectivity is a workforce retention lever on long-duration programs. FPS designs the camp to the crew's standards, not the minimum code allows.

  • W.04
    Health, Safety & Code

    State health department, fire marshal, OSHA, ADA, and local AHJ requirements embedded from site design forward. Permitting liaison handled by FPS, not deferred to the owner.

  • W.05
    Audit-Grade Reporting

    Occupancy, meals served, utility consumption, and cost accounting documented to the standard required by federal programs, project finance, and owner audit.

  • W.06
    Remote & Austere Sites

    No-infrastructure greenfields, extreme climate, and OCONUS theaters. The same camp doctrine FPS runs for federal and military base camps applies to commercial programs in hard places.

Doctrine

One team owns the camp.
  • One contract, one PMO, one point of accountability from site survey through site restoration.
  • Power, fuel, water, wastewater, and life support run under FPS direction.
  • Food service, housekeeping, and security operated as a single managed function, not stacked vendors.
  • Federal-grade documentation discipline applied to commercial programs.
  • Same operating model as FPS Base Camps & Life Support, applied to EPC, energy, and infrastructure owners.

Eight functions. One managed campus.

The full camp lifecycle, scoped independently or delivered as a single turnkey engagement. Each function is engineered to the project's headcount model, duration, and site conditions.

01

Site Selection & Camp Design

Site survey, headcount and duration modeling, camp layout, utility baseline, drainage and access planning, and permitting liaison with local and state authorities.

  • — Site survey + geotech coordination
  • — Layout to headcount model
  • — Utility baseline + sizing
  • — Permitting liaison
02

Billeting & Accommodation

Modular dormitory and private-room configurations, supervisor and management units, ADA-compliant units, climate control, and furnishings specified to the duration of the program.

  • — Shared, private, supervisor units
  • — ADA-compliant
  • — Climate controlled
  • — Furnished to duration
03

Food Service & Dining

Commercial kitchen and dining hall operations, three meals daily plus shift meals, dietary and religious accommodation, and health-department compliant food handling.

  • — Commercial kitchen
  • — Three meals + shift meals
  • — Dietary accommodation
  • — Health dept compliant
04

Sanitation & Laundry

Shower and latrine facilities, laundry operations, grey and black water handling, solid waste management, and housekeeping across common areas and billeting.

  • — Shower + latrine
  • — Laundry operations
  • — Grey + black water
  • — Housekeeping
05

Power, Water & Utilities

Generator or turbine power with distribution, potable water supply and treatment, wastewater, fuel logistics, and communications. Delivered in coordination with FPS Power & Energy and Electrical Systems.

  • — Prime + backup power
  • — Potable water + treatment
  • — Wastewater
  • — Fuel + comms
06

Security & Access Control

Perimeter, gate, and badge-controlled access, 24/7 security presence, camera coverage, visitor management, and incident response protocol coordinated with the project's safety program.

  • — Perimeter + gate
  • — Badge access
  • — 24/7 presence
  • — Incident protocol
07

Transport & Logistics

Crew transport between camp and site, shift scheduling alignment, parking, equipment staging, and materials receiving for camp operations.

  • — Crew transport
  • — Shift-aligned scheduling
  • — Equipment staging
  • — Receiving
08

Operations & Demobilization

24/7 camp management, preventive maintenance, occupancy and cost reporting, phased drawdown as the project completes, and site restoration to pre-camp condition.

  • — 24/7 camp management
  • — Preventive maintenance
  • — Occupancy + cost reporting
  • — Phased demob + restoration
FPS / SOL-01 / Integration

Built on the same doctrine as our federal base camps.

FPS Base Camps & Life Support has stood up turnkey facilities for hurricane response, wildfire deployments, Diego Garcia, PANAMAX 2026, and partner-supported execution across nine countries. Workforce Housing Solutions applies that operating record to EPC, energy, and infrastructure owners.

Base Camps & Life Support

Three scale tiers. One operating model.

Camp architecture is sized to the program, not the other way around. The operating discipline does not change between a 100-bed crew camp and a 5,000-bed campus; the engineering does.

Tier / 01
100– 500 beds

Crew Camp

Six to eighteen month programs. Pipeline and transmission segments, plant turnarounds, disaster response lodging, remote industrial maintenance campaigns, and federal task orders.

  • Modular billeting + dining
  • Generator power
  • Trailer-based sanitation
  • Occupancy in days
Tier / 02
500– 2,000 beds

Project Camp

Eighteen to forty-eight month programs. Industrial plant construction, data center build-outs, mining and resource development, and multi-phase infrastructure projects.

  • Dormitory blocks + full kitchen
  • Engineered distribution
  • Water + wastewater treatment
  • Recreation + connectivity
Tier / 03
2,000– 5,000+ beds

Program Campus

Three to ten year programs. Nuclear and advanced energy construction, LNG and petrochemical mega-projects, and long-horizon federal installations.

  • Campus-scale layout
  • Prime power + redundancy
  • Medical + emergency services
  • Phased expansion + demob

From site survey to site restoration, four phases.

The phases are sequential; the accountability is continuous. The same FPS team that surveys the site runs the camp and signs off on restoration.

01
Days 1 – 10

Assess

Site survey, headcount and duration model, utility baseline, permitting pathway, and camp layout. Deliverable: camp design package and mobilization schedule.

02
Days 10 – 30

Mobilize

Site preparation, utility stand-up, modular placement, kitchen and sanitation commissioning, security perimeter. First occupancy phased against the project's own ramp.

03
Program Duration

Operate

24/7 camp management, food service, housekeeping, maintenance, security, transport, and reporting. Capacity flexed up or down as headcount changes.

04
Final 30 Days

Demobilize

Phased drawdown aligned to project completion, modular removal, utility disconnection, site restoration, and final documentation package to the owner.

Programs served.

Nuclear & Advanced Energy Construction
Data Center Build-Out
LNG & Petrochemical
Mining & Resource Development
Utility & Transmission
Pipeline Construction
Industrial Turnarounds
EPC Programs
Disaster Response Lodging
Federal & Military Installations
OCONUS Projects
Remote Infrastructure

The operating record behind the solution.

Workforce Housing Solutions draws on the same base camp and life support record FPS has built across federal, military, and disaster theaters.

Full Case Library

Model the camp
before you model the schedule.
A headcount conversation now saves months later.

For EPC programs, energy owners, and infrastructure developers planning large-headcount projects, FPS leadership is available for a camp feasibility briefing by direct line or on-site visit.