FPS / Divisions / Industrial Services FPS / 2026 / DIV-07 DIV / 07

When the plant cannot stop, we don't either.

FPS Industrial Services serves continuity-critical plants and campuses where downtime is not an acceptable budget line. Past performance includes the $75M Steel Foundry catastrophic fire — re-energized in 57 days — alongside Disney Archives, Texas Medical Center, GM, and AIG. Plant-side maintenance, turnaround support, industrial electrical, and structural restoration under a single PMO.

$75M
Steel Foundry Recovery
4
Marquee Campuses
57
Day Re-Energization
OSHA
Safety Aligned

Heavy industrial scope, delivered plant-side.

Eight service lines engineered for the operational, safety, and scheduling realities of heavy industrial environments — petrochemical, manufacturing, refining, and energy.

01

Industrial Restoration

Heavy industrial restoration past performance — including the $75M Steel Foundry catastrophic fire recovery, re-energized in 57 days from Date of Loss.

  • — Steel Foundry $75M
  • — 57-day re-energize
  • — Heavy industrial
02

Plant-Side Maintenance

Routine and corrective maintenance scopes executed plant-side — aligned to plant safety, scheduling, and operational protocols.

  • — Plant-aligned
  • — Routine + corrective
  • — Safety integrated
03

Turnaround Support

Major turnaround support — scaffolding, access, mechanical scope, structural work, and shutdown-window-aligned execution.

  • — TA support
  • — Shutdown-aligned
  • — Multi-discipline
04

Industrial Electrical

Plant-side electrical scope including 15kV power station design, fabrication, and install. Integration with FPS Electrical Systems on complex industrial scopes.

  • — 15kV capable
  • — Plant-side
  • — Integrated DIV-03
05

Structural Restoration

Industrial structural restoration — towers, supports, racks, foundations engineered to industrial loading and seismic standards.

  • — Towers + racks
  • — Foundation work
  • — Industrial standards
06

Industrial Roofing

Heavy industrial roofing — single-ply, modified bitumen, metal, and specialty industrial systems with plant-aligned execution windows.

  • — Multi-system
  • — Plant-aligned
  • — Heavy industrial
07

Production Continuity

Production-continuity planning embedded in restoration and maintenance scopes. Industrial fire events, water losses, and structural events with continuity protected.

  • — Continuity planning
  • — Industrial events
  • — Embedded in scope
08

Marquee Campus Capability

Past performance at marquee industrial and institutional campuses — Disney Archives, Texas Medical Centers, GM Plant, AIG Campus, refinery and data center operations.

  • — Disney + TMC
  • — GM + AIG
  • — Refinery + DC
FPS / DIV-07 / Plant-Side Execution

Continuity is the deliverable.

Turnaround support, structural restoration, industrial electrical, and plant-side maintenance scheduled to the plant's outage windows, not the contractor's convenience.

Marquee Campus Record

Engineered for plant-side realities.

Industrial work is governed by safety culture, scheduling discipline, and operational integration. The methodology that delivered a 57-day re-energization at $75M scope is the same methodology applied to every industrial engagement.

  • I.01
    Steel Foundry Reference

    $75M catastrophic fire — 50+ A/E personnel, 300+ production staff, multiple 15kV power stations, sub-zero conditions. Reference engagement for industrial scale.

  • I.02
    Marquee Campus Capability

    Disney Archives, Texas Medical Centers, GM Plant, AIG Campus — continuity-critical institutional engagements at scale.

  • I.03
    Plant Safety Integration

    OSHA, plant-specific, and industry-aligned safety culture. JSAs, hot work, LOTO, confined space, and contractor onboarding embedded in operations.

  • I.04
    Turnaround Discipline

    Major turnaround scheduling discipline — pre-TA planning, shutdown-window execution, and post-TA closeout aligned to plant operational windows.

  • I.05
    Petrochemical Standards

    Petrochemical, refining, and chemical plant operational standards. Hydrocarbon handling, fire-rated work, intrinsically safe environments.

  • I.06
    Multi-Discipline Integration

    Structural, mechanical, electrical, roofing, and scaffolding scopes integrated under one PMO — minimizing plant-side coordination overhead.

Active Engagements

Active in industrial, today.
  • $75M Steel Foundry recovery — multiple 15kV power stations, 57-day re-energization.
  • Marquee campus past performance — Disney Archives, Texas Medical Centers, GM, AIG.
  • Plant-side restoration scopes across petrochemical and energy clients.
  • Industrial roofing portfolio across heavy industrial and manufacturing clients.
  • Refinery and data center operations past performance.

Sectors served.

Steel & Foundry
Petrochemical
Manufacturing
Refining & Energy
Power Generation
Heavy Industrial
Data Center
Mission-Critical
Healthcare Campuses
Corporate Campuses
Industrial Roofing
Plant Turnarounds

Engagements in this division.

A representative selection. Each case demonstrates this division's capability against a live engagement, active program, or documented past performance.

Full Case Library

Engage FPS
before the event.
When the partnership is already in place.

24/7/365 dispatch for emergency response. For program-level engagements, capability briefings, or master service agreements — our leadership is available by direct line and on-site visit.

24/7/365 Emergency Dispatch
Strategic Partnerships
Thomas Sirk
VP, Strategic Partnerships · 904-720-6556
Direct Email
Headquarters
FPS
32603 Tall Oaks Way · Magnolia, TX 77354