Where electrical complexity defines the engagement.

FPS Electrical Systems is the lever that converts response into recovery. 15kV power stations, MV/LV distribution, code-compliance overhauls, EPC single-source — proven on the $75M Steel Foundry catastrophic fire, re-energized in 57 days under sub-zero conditions.

15kV
Power Station Class
57
Day Steel Foundry Re-Energize
50+
A/E Personnel (Steel Foundry)
EPC
Capable End-to-End

From 15kV power station through full distribution overhaul.

Eight service lines covering complex electrical scope from initial assessment through commissioning. Engineered for industrial environments, code-compliance overhauls, and disaster-zone re-energization timelines.

01

15kV Power Station Design / Fab / Install

Multiple 15kV power stations designed, fabricated, and installed in the Steel Foundry recovery alone. Full design through commissioning, including primary and secondary distribution.

  • — 15kV class
  • — Design + fab + install
  • — Primary + secondary
02

Medium-Voltage Distribution

Medium-voltage (MV) distribution engineering, panel integration, transfer schemes, and protective relaying for industrial and federal applications.

  • — MV distribution
  • — Transfer schemes
  • — Protective relaying
03

Low-Voltage Distribution

LV distribution panel design, branch circuit engineering, motor control centers, and load center integration with the broader plant electrical system.

  • — LV panels + MCCs
  • — Branch engineering
  • — Load centers
04

Switchgear & Paralleling Controls

Switchgear, automatic transfer switches, paralleling controls, and synchronization equipment for multi-source power architectures.

  • — Switchgear + ATS
  • — Paralleling
  • — Synchronization
05

Code Compliance Overhauls

Internal power distribution overhauls to current code requirements — including post-event rebuilds where original installations no longer meet AHJ standards.

  • — Current code
  • — AHJ coordination
  • — Post-event rebuilds
06

Load Analysis & Phased Energization

Load analysis, phased energization sequencing, and electrical tie-ins coordinated with operations and AHJ for safe, code-compliant restart.

  • — Load analysis
  • — Phased energize
  • — Electrical tie-ins
07

Disaster-Zone Electrical

Electrical scope executed in compromised environments — fire, water, sub-zero conditions, structural compromise — under federal-grade timelines.

  • — Compromised environments
  • — Sub-zero capable
  • — Federal timelines
08

EPC Single-Source

Engineering, procurement, construction, and commissioning under one accountable team — single point of responsibility from design through final energization.

  • — Engineering
  • — Procurement
  • — Commissioning
FPS / DIV-03 / Reference Engagement

Multiple 15kV power stations. 57 days. Sub-zero.

The Steel Foundry catastrophic fire recovery is the reference engagement for FPS electrical scope: designed, fabricated, installed, and energized under one PMO.

Steel Foundry Case

Electrical methodology, built for the events that don't bend.

Our electrical methodology was forged in events that don't accommodate standard timelines — catastrophic industrial fires, sub-zero post-event conditions, federal contingencies. The discipline that delivered a 57-day re-energization at $75M scope is the same discipline applied to every electrical engagement.

  • E.01
    Steel Foundry Reference

    $75M catastrophic fire — multiple 15kV power stations designed, fabricated, and installed; full distribution overhaul; re-energized in 57 days from Date of Loss.

  • E.02
    AHJ-Forward Coordination

    Authority Having Jurisdiction coordination embedded from the first site visit. Code requirements scoped before fabrication begins, not after install.

  • E.03
    Code Compliance Overhauls

    Where original installations no longer meet current code, FPS' electrical scope includes the engineering to rebuild to current standards — not just replace what was.

  • E.04
    50+ A/E + 300+ Production

    On the Steel Foundry engagement alone, FPS deployed 50+ A/E personnel and 300+ production staff under one PMO — scaled execution capacity is real.

  • E.05
    Sub-Zero Capable

    Electrical work executed under sub-zero temperature conditions on the Steel Foundry recovery. Cold-weather methodology proven, not theoretical.

  • E.06
    Integrated With Power & Disaster

    Electrical Systems plug directly into Power & Energy and Disaster Recovery scope — a fire event becomes a re-energization, not a sequence of vendor handoffs.

Active Engagements

Active in electrical, today.
  • $75M Steel Foundry recovery — multiple 15kV power stations, distribution overhaul, 57-day re-energization.
  • Industrial electrical scope on plant-side maintenance and turnaround engagements.
  • Code compliance overhauls on post-event commercial and industrial properties.
  • Integration with Power & Energy on hyperscale and federal deployments.
  • AHJ coordination embedded across active disaster recovery engagements.

Sectors served.

Steel & Foundry
Heavy Industrial
Petrochemical
Manufacturing
Refining
Federal Installations
Data Center
Hyperscale
Healthcare
Mission-Critical
Disaster Recovery
Code-Compliance Rebuilds

Engagements in this division.

A representative selection. Each case demonstrates this division's capability against a live engagement, active program, or documented past performance.

Full Case Library

Engage FPS
before the event.
When the partnership is already in place.

24/7/365 dispatch for emergency response. For program-level engagements, capability briefings, or master service agreements — our leadership is available by direct line and on-site visit.